Case Studies
Parking Garage Cold Joint Testing
What happens when concrete pours are interrupted on a major structure? At a San Jose parking garage, cold joints in beams and slabs raised critical questions about construction quality and long-term durability. Concrete Science, Inc. launched a comprehensive investigation using non-destructive testing, core sampling, and lab analysis to uncover what lay beneath the surface.
Post-Tension: Chlorides, Carbonation, and Targeted Repairs
From chain drag to petrography, see how a targeted condition assessment turned scattered symptoms into a prioritized repair and coating plan for a post tensioned parking deck.
Multi-Level Parking Structure Assessment & Repair
Multi-level parking garage inspection and repair with Concrete Science® Inc. Expert diagnostics included delamination surveys, core sampling, petrographic analysis, and corrosion tests. Solutions tackled low compressive strength, carbonation risks, and future reinforcement protection. Tailored repairs ensure safety, longevity, and structural integrity for parking facilities nationwide.

