Concrete Science, Inc. performed flooring evaluation and testing and evaluation was to determine the causes of distress in the rubber flooring bonded to the slab.
The rubber flooring showed distress in the form of bubbles at random locations throughout the facility.
Reportedly, these bubbles in the rubber flooring had started appearing within 2 to 3 months after the rubber flooring installation .