Commercial Projects
MULTI-STORY BUILDING


Several multi-story buildings were investigated to determine the cause of cracking and spalling. The addition of corrosive salts in the original concrete mix in some buildings was determined to be the main cause of distress. A repair scheme was designed to extend the service life of the building.